Blogs  |  Message Boards  |  Newsletter
ProTV  |  Sweepstakes  |  Best of HGTVPro
HGTVPro.com
Top 10 Best Practices
Spray Foam Insulation
Insulate Attic Access
Blown-in & Spray Cellulose
Solar Roof Shingles
French Drains
Strengthen Concrete Slab
Indoor Air Quality
Radiant Floor Heat
Acoustic Wall Insulation
Basement Floor Insulation
See All Best Practices
Energy Efficient Windows
See energy efficient window designs and learn how to choose the right windows.
Browse Efficient Windows
Building HGTV Green Home
Time-lapse photos and video interviews show how we used industry Best Practices to build HGTV Green Home 2010.
See How We Did It
Building HGTV Dream Home
Building industry Best Practices went into the construction of HGTV Dream Home 2010.
See It Being Built
Sponsored Content





 
Porous Pavement

Watch the video on Porous Pavement.

Using porous pavement for a home's driveways, walkways, and patios has numerous benefits for the environment. For one, it helps recharge groundwater by allowing rain and snowmelt from paved surfaces to percolate into the soil. Porous pavement also reduces stormwater runoff and the contaminants that runoff carries. Further, the water that is absorbed into the soil is of a higher quality because porous pavement systems filter some pollutants out of the water before it's absorbed.

Builders and homeowners can benefit from using porous pavement, too. Builders can realize cost savings because porous pavement systems integrate a sub-surface base reservoir to store and transmit water, eliminating the need to build detention basins. Homeowners benefit because porous pavement provides an attractive, cost-effective, and green alternative for the home's outdoor hardscape surfaces.

Porous pavement options for residential use include porous aggregate, open-jointed blocks, pervious concrete, and porous asphalt. Regardless of the porous pavement used, all systems have these 3 components: the sub-grade, a base course, and a surface course.

  • Sub-grade. The bottom layer is the sub-grade. To create it, the ground is excavated to a level surface and is not compacted. This allows water to distribute and infiltrate evenly over the entire area. During construction, it's important to avoid compacting this area, either intentionally or unintentionally because compaction will prevent infiltration. Also, the sub-grade cannot be fill material unless that fill material is stone.

  • Base course. The base course, directly above the sub-grade, is a bed of uniformly graded and clean-washed aggregate. It adds structural thickness over the sub-grade, stores and transmits water, and serves as a rooting zone for trees. The base course thickness, which is calculated per-installation, disperses the loads above, compensates for wet or uncompacted sub-grade, and counteracts heaving pressure. In certain soil conditions, the base course may contain a discharge pipe for lateral overflow. Also, a filter fabric typically is placed beneath the base course to screen out fine soil particles.

  • Surface course. The surface course is the porous aggregate, open-jointed blocks, pervious concrete, or porous asphalt that comprises the hardscape and allows water to penetrate. It is installed directly over the base course.

Keys to the long-term success of porous pavement systems are correct design, successful installation, and proper maintenance. Design for the system is site-specific and must consider the soil conditions, climate, topography, and use for the porous pavement, including loads and frequency of use. Installation practices must be clearly specified and communicated to the installers, and strict supervision throughout the project is highly recommended. Porous pavement systems that fail typically are the result of incorrect installation. Finally, ongoing maintenance is important to promote maximum water flow-through and the longevity of the system. A proper maintenance plan for open-jointed blocks, pervious concrete, and porous asphalt should include regular inspecting, cleaning, and patching.

  • Inspecting. Look carefully at the pavement several times during the first few months after installation for visible problems. Thereafter, conduct annual inspections, especially after big storms when clogging of the surface course would be most obvious.

  • Cleaning. Vacuum sweep the porous pavement 2 to 4 times a year and then pressure-wash it with water to keep the pores in the surface course from clogging. Eliminate spot clogging by drilling 1/2-inch holes through the surface layer every few feet throughout the clogged area.

  • Patching. Fill potholes and cracks with patching mixes. If more than 10% of the surface area needs repair, further investigation and possible reconstruction may be needed.

If the surface layer is porous aggregate, it requires minimal maintenance. Aggregate that has been displaced or compacted by vehicles or snowplows can be loosened and leveled with a rake. If traffic has crushed aggregate into fine particles, or if aggregate has been pushed off a driveway, the aggregate should be replaced. Some aggregate surfaces may require weeding.

To learn more about Porous Pavement, visit:
www.forester.net/sw_0305_porous.html
www.epa.gov/OW-OWM.html/mtb/porouspa.pdf

See also: Porous Pavements (Integrative Studies in Water Management and Land Development), by Bruce K. Ferguson (2005).


Best Practices Index
Foundation
Framing
Green Building
Interior Finishes
Exterior Finishes
Insulation
Mechanical
Doing Business
Deep Energy Retrofit
Energy efficient remodeling is the most cost-effective, simplest way to cut utility bills.
Remodel for Energy Efficiency